Installation for the system was carried out on Jan-08. I've done this my self with the help of 1 assistant. It took me 3 days to complete the installation. The 3 days were excluding assembling the nipples and dripper to the micro tubing. With the help of my family, I managed to complete assembling the tubing complete with nipples and dripper within 4 nights.
Another big job is fixing the tubing to the sub-line. I complete this in 2 days with the help of 1 assistant.
Summary
Install main system= 3 days
Assemble tubing + dripper + nipple= 4 nights=2 days
Assemble tubing to sub-line= 2 days
Total = 7 days